How To Do A Good Job In The Installation Of Folding Containers Before And After Installation

2023-06-10

1、 Preparation work before installation

There are still many things to do before installing a mobile house. The main task is to strictly inspect the quality of the board. Damaged or unusable panels need to be removed and replaced. Another point that cannot be ignored is reviewing and correcting. Incomplete components such as bolts, waterproof rings, and metal pads. When installing mobile houses externally, we cannot ignore the flatness, and every different connecting device must be aligned.

The layout between walls needs to be correct. After the equipment is in good condition, check for excessive joint clearance. It is necessary to organize and adjust methods in a timely manner. In the room, installation materials and wiring must comply with relevant specifications, and different power facilities must meet design requirements, be reasonable, and have fire prevention and insulation methods in place. When organizing the layout and facilities of firefighting methods, attention should also be paid to opening firefighting passages, preparing firefighting equipment, and minimizing the laying of wooden floors. Emergency measures for grounding and lightning protection are also required, and must be carried out in accordance with testing standards. All types of plates should be treated with anti-corrosion and rust prevention, while steel plates should be treated with protective films.

2、 Protection measures need to be taken after installation

1. Please consult a professional company to view the site; It is very important to take a look at this website. In addition to measuring the size of the site, it is more important to understand the natural environment, develop a basic plan for mobile housing, and confirm the roof of the mobile housing. Do the framework and walls need to be reinforced and reinforced. This directly affects the quality of future use of mobile prefabricated houses, which can be compensated in the future.

2. After the folding container is built, users are not allowed to replace the structure of the prefabricated house at will, nor are they allowed to dismantle any bolt components; The skeleton of the board meeting room is a whole. If there is a problem with the entire part, it will have a ripple effect. If you want to add or reduce partitions, you should mainly contact the manufacturer, listen to their opinions and information about the board meeting room, and then contact the manufacturer. The overall structural connection between the movable board house and the light steel structural components. When users organize circuits, wires and cables cannot be directly connected to the steel structure of the circuit board room. Pipelines or wire ducts should be installed separately to prevent electric shock. After more than two years, the exterior wall coatings of light steel structural components will age and fall off. At this point, painting should be started from scratch to maintain the service life of steel structural components and prevent excessive rust and aging.